You can view some of recent work by selecting one of the slideshow presentations below.
•
CRE Consults on John Hancock Backup "ALERI" Antenna
•
CRE Consults on new John Hancock Combiner control system
•
CRE Repairs Marti R-10 and Moseley PCL-606 STL Systems in 2008
•
CRE and Krueger Towers Installs New Isocoupler at WONX
•
Recent Krueger Tower Project
•
CRE Installs New ATU for WMCW
•
Dr. Jim White uses TDR to Repair WBEZ-FM STL Link
•
CRE Takes Narrow Band Input Measurements
•
CRE Rebuilds WONX Studios
•
CRE Rebuilds Continental 377D-2 Controller
•
CRE Repairs and Calibrates FM Exciters
•
CRE Repairs 30 KW Continental FM Transmitter
•
CRE Repairs 10 KW Harris FM Transmitter
•
CRE Installs New PA Deck in WLUP 10 KW FM Transmitter
•
CRE Repairs NPR Station WBEZ 5 GIG STL
•
CRE Supports WKQX & WLUP Morning Drive Studios
•
CRE Installs IBOC for WLUP & WKQX
•
CRE Installs WSCR 50 KW Transmitter
•
CRE Builds WTMX Main Air Studio
•
CRE Consults on WTMX Sears STL
•
CRE Installs Nautel 1 KW AM Transmitter
• CRE Consults on John Hancock FM Combiner
•
Richland Individual FM Station Measurements
•
Richland Combiner Measurements
•
IBOC Coax Switch Installation
•
IBOC Watt Meter Installation
•
Generator Computer Interface
•
Generator Floor Plans
•
93 Floor Automatic Transfer Switch
•
ERI Backup Antenna
•
West Tower
•
Alford Antenna Exterior
•
Alford Antenna Tower Feed
•
Alford Logic
•
Alford Mead Instructions
•
Antenna Switch
•
Best UPS Removal
•
Component Temp. Measurements
•
Computer
•
Half Power Controller
•
Alford Dummy Load Repair
•
Lock-Out: Tag-Out Switches
•
Reflected Power Tests
•
Safety Switch Covers
•
Transmission Line Dehydrator
•
UPS Installation
•
WLP Protoype RF Sampling
ChicagoRadioEngineers.com © 2006-2007 |
Privacy Policy
|
Terms of Use
Hosting by
ChicagoServer.com